Belwind Offshore wind farm (Ballast Nedam / VanOord) September 2009 until February 2010
In late September the multicat Yogi left from Liverpool and was heading to Zeebrugge. When arrived the Multicat Yogi was assiting the HVLS Svanen outside Zeebrugge on the Bligbank 18 miles offshore.Here the HVLS Svanen made foundations for a new wind farm on the Blighbank. The multicat Yogi assisted with anchorhandling, and positioning monopiles (foundations) on the inner side of the HVLS Svanen.
|