Yogi_pushing_barges_ostendStene Twins Ostend (DEME) March 2010 until August

In late March the multicat Yogi left the Thanet wind farm project because she had a deadline had to arrive at Ostend to participate work at the Twin Stene project. Here the breakwaters were were extended from the port of Ostend, the Yogi was pushing pontoons loaded with stones, gravel and concrete blocks dragging and pushing themselves within the port and the jetties where crane barges were unloading them.
 
 